1. Forum
    1. Unresolved Threads
    2. Threads of last 24 hours
  2. Dashboard
  3. News
  4. Members
    1. Recent Activities
    2. Users Online
    3. Team
    4. Search Members
  5. Discord
  6. Society
    1. History
  7. Shop
  8. DMXControl
    1. Übersetzung
    2. Bugtracker
  9. DDF Library
  10. Wiki
  • Login
  • Register
  • Search
Live@Work
  • Everywhere
  • Live@Work
  • News
  • Pages
  • Forum
  • More Options
  1. DMXControl Projects e.V.
  2. News
  3. DMXControl
  4. Live@Work

Live@Work - 18_KW41 - 2. Bericht: Executor-Party in Herrenberg

  • Logo DMXControl Projects e.V. deluxe^2
  • October 9, 2018 at 8:00 PM
  • 2,167 Views
  • 0 Comments

Today our Live@Work trip goes to Samuel and with him in the northern Black Forest to the "Egenhäuser Kapf". Read in this news posting all about his "Executor-Party" at "THE CAMP".

For the confirmands in the Herrenberg church district in the south of Stuttgart, Germany there is always a special highlight that everyone is looking forward to: "THE CAMP". In every summer we have a confirmation leisure on a weekend organized by the EJW-Herrenberg. We go with the confirmands on the Egenhäuser Kapf to a tent camp. This year a total of around 150 young people aged 13 took part. In addition to fun sports activities, the live event with live music in the evening is one of the highlights of the confirmation leisure.

For the lighting of the live-event we use a total of six RGB LED-Par64 and two cheap but large China RGBW spotlights. Since there is no room behind the band, we positioned two crank tripods on the left and right side of the stage. A 2-point truss was attached to the tripods with a suitable mount. With this construction the headlights could now be easily mounted on the so created bars. Due to the length of the truss we got the necessary depth to illuminate the band from the front side as well as from the back side. In order to further improve the lighting, we crossed the beams of the front lights.

For our small setup a laptop and of course a Nodle-interface worked quite well. This year we used DMXControl 3 for the first time. Especially the executors were used very intensively to control the whole stage light. We have stored the different light scenes in separate cuelists. So it happened that in some cuelists only one cue was stored. More complex cuelists with multiple cues were only used for some chasers. Thanks to a single cuelist group and the corresponding settings, only one cuelist was active at a time. This made working with the executors even easier. We had assigned an executor to each cuelist, which made all cuelists directly accessible and controllable. Therefore I basically didn't use other control possibilities like the softdesk during the evening. Almost everything ran with the executors, both during music and other show interludes. Only for very special show items we set some settings directly in the Stage View.

Samuel

  • DMXControl Projects e.V.
  • Live@Work
  • DMXControl 3

Comments

Newly created comments need to be manually approved before publication, other users cannot see this comment until it has been approved.

  • Smilies
  • Default Category
  • DMXControl
  • :argh:
  • :shit:
  • :)
  • :(
  • ;)
  • :P
  • ^^
  • :D
  • ;(
  • X(
  • :*
  • :|
  • 8o
  • =O
  • <X
  • ||
  • :/
  • :S
  • X/
  • 8)
  • ?(
  • :huh:
  • :rolleyes:
  • :love:
  • 8|
  • :cursing:
  • :thumbdown:
  • :thumbup:
  • :sleeping:
  • :whistling:
  • :evil:
  • :saint:
  • <3
  • :!:
  • :?:
  • :glaskugel:

Newly created comments need to be manually approved before publication, other users cannot see this comment until it has been approved.

  • Smilies
  • Default Category
  • DMXControl
  • :argh:
  • :shit:
  • :)
  • :(
  • ;)
  • :P
  • ^^
  • :D
  • ;(
  • X(
  • :*
  • :|
  • 8o
  • =O
  • <X
  • ||
  • :/
  • :S
  • X/
  • 8)
  • ?(
  • :huh:
  • :rolleyes:
  • :love:
  • 8|
  • :cursing:
  • :thumbdown:
  • :thumbup:
  • :sleeping:
  • :whistling:
  • :evil:
  • :saint:
  • <3
  • :!:
  • :?:
  • :glaskugel:
  • Previous News Live@Work - 18_CW41 - 1. Report: Musical of the Vaihinger Children's Choir
  • Next News Live@Work - 18_CW41 - 3. Report: Wedding party at the Neue Brüderkirche, Kassel

Related News

Live@Work - 21_CW03 - Christmas under special circumstances

TBD
Logo DMXControl Projects e.V. JPK
January 22, 2021 at 6:00 PM
Like 1
0

Live@Work - 21_KW40 - Out of the box

For a long time, many of you couldn't really get the equipment out the door from the ancestral storage space. For alternative projects, however, this is not necessary at all.
Logo DMXControl Projects e.V. LightningBrothers
October 6, 2021 at 12:00 PM
Like 7
0

Live@Work - 23_CW51 - Wedding in the fifth try with DMXC 3.2.3

There's a special news for Christmas this year: a guest post from our community member Steff about his use of DMXControl 3.2.3 at a wedding, which he was finally able to make up for this summer.
Steff
December 24, 2023 at 2:00 PM
Like 4
0

Categories

  1. Association 359
  2. Association News 214
  3. DMXControl Conventions 120
  4. DMXControl Convention 2026 4
  5. DMXControl 197
  6. Developer News 90
  7. Releases 18
  8. Did you know? 45
  9. Live@Work 40
  10. Current Maintenance Work 5
  11. Forum Guidelines and Informationen 5
  12. Reset Filter

Users Online

  • 5 Members (1 invisible) and 384 Guests
  • Record: 34 Users (November 24, 2019 at 7:46 PM)
  • Logo DMXControl Projects e.V. Frank Brueggemann
  • Helmut
  • namezero111111
  • Logo DMXControl Projects e.V. Hoc
Legend
  • Logo DMXControl Projects e.V. Administrators
  • Logo DMXControl Projects e.V. DMXControl member
© DMXControl Projects e.V. 2018 - 2026
Gemeinnütziger Verein DMXControl Projects e.V.
Powered by WoltLab Suite™
  1. Terms of use
  2. Legal Notice
  3. Privacy